Dynamic Vision Inc. is providing independent
Third-Party Monitoring (TPM) services to UNOPS for the Infrastructure for Basic
Human Needs (IBN) Programme in Herat Province, Afghanistan. Financed by the
German Development Bank (KfW) on behalf of the Federal Ministry for Economic
Cooperation and Development (BMZ), the programme supports the recovery of
communities affected by the October 2023 Herat earthquakes through the
reconstruction of essential infrastructure and restoration of basic public
services.
The assignment provides independent
verification, implementation oversight, safeguards monitoring, and performance
assurance across a portfolio of infrastructure interventions. Operating as an
independent monitoring partner, Dynamic Vision supports UNOPS and KfW by
strengthening transparency, accountability, and evidence-based decision-making
throughout programme implementation.
Assignment Context
The October 2023 earthquakes caused extensive
destruction across Herat Province, affecting more than 275,000 people and
damaging housing, water systems, irrigation infrastructure, public facilities,
markets, and community assets.
The Infrastructure for Basic Human Needs (IBN)
Programme was established to restore essential infrastructure, improve
community resilience, and support long-term recovery across approximately 50
earthquake-affected villages.
Given the scale of the programme and the
operational complexity of implementation, UNOPS engaged Dynamic Vision to
provide independent monitoring and verification services throughout project
delivery, ensuring that implementation progress, technical quality,
environmental and social performance, and contractual compliance are
independently assessed and reported.
![]()
- Client Objectives
The assignment supports UNOPS and KfW by
providing independent assurance that programme implementation remains aligned
with contractual requirements, technical specifications, environmental and
social commitments, and intended development outcomes.
Key objectives include:
- Independently verify physical progress
across infrastructure investments.
- Monitor implementation quality and
contractor performance.
- Assess compliance with environmental,
social, health, safety, and safeguards requirements.
- Verify programme outputs and milestone
achievements.
- Identify implementation risks and
recommend corrective actions.
- Support transparent reporting to UNOPS,
KfW, and programme stakeholders.
- Strengthen accountability through
evidence-based monitoring and independent field verification.
![]()
- Technical Scope
& Services
Dynamic Vision delivers an integrated
third-party monitoring programme covering the full implementation lifecycle.
1
Independent Infrastructure Monitoring
- Physical progress verification
- Construction quality monitoring
- Engineering inspections
- Contractor performance assessments
- Milestone verification
2
Environmental & Social Safeguards
- Environmental and Social Management Plan
(ESMP) compliance
- Occupational health and safety monitoring
- Community health and safety assessments
- Stakeholder engagement verification
- Grievance mechanism monitoring
- Gender and social inclusion assessments
3
Delivery Assurance & Compliance
- Independent compliance verification
- Contract performance monitoring
- Risk identification and mitigation
- Corrective action tracking
- Evidence-based reporting
- Quality assurance reviews
4
Programme Monitoring
- Site inspections
- Beneficiary consultations
- Progress reporting
- Photographic documentation
- Data verification
- Performance analysis
![]()
- Geographic &
Sector Coverage
The assignment covers multiple
infrastructure interventions across earthquake-affected communities throughout
Herat Province.
Programme sectors include:
- Permanent housing and shelter
reconstruction
- Community infrastructure
- Drinking water systems
- Irrigation rehabilitation
- Flood protection infrastructure
- Agricultural water supply
- Rubble removal and demolition
- Community resilience infrastructure
- Operational
Delivery Approach
Dynamic Vision deploys multidisciplinary field
teams operating independently from implementing contractors to provide
objective and evidence-based assessments of programme performance.
Monitoring combines structured field
inspections, engineering verification, safeguards assessments, stakeholder
consultations, photographic evidence, document review, and compliance
monitoring. Findings are analysed against contractual obligations, technical
specifications, environmental and social commitments, and implementation
schedules before being communicated through structured reporting to UNOPS.
The assignment integrates the DV Delivery
System™ and Assured Delivery™ methodology, enabling early
identification of implementation risks, verification of completed works, and
continuous performance assurance throughout programme execution.![]()
- Strategic
Significance
This assignment demonstrates Dynamic Vision's
capability to deliver independent assurance for large-scale donor-funded
infrastructure programmes operating in complex environments.
Beyond monitoring construction progress, the
engagement strengthens programme governance by providing independent
verification of implementation quality, safeguards compliance, risk management,
and development outcomes. Through objective monitoring and evidence-based
reporting, the assignment supports informed decision-making by UNOPS and KfW
while helping safeguard public investment and strengthen accountability
throughout programme delivery.
The engagement also reinforces Dynamic Vision's
growing role as a trusted provider of independent infrastructure monitoring,
implementation assurance, environmental and social compliance, and programme
performance verification for governments, development finance institutions, and
international organizations.
Project Gallery